PWD: Team Engages in Roadwork Near Washington Archibald High School

Date:

About the Roadwork Schedule

The schedule publishes the whereabouts of the roads team, the projects in which they engage, the duration of those projects and the nature of the work involved.

Activities

On Wednesday, August 7, 2024, the roads team engaged in preparations for road work on speed bumps in the vicinity of the Washington Archibald High School. As the team works over the next few days, the Public Works Department asks the general public to exercise caution when travelling through the area.

Date & Time

August 7, 2024 (9:00 am) – To be released (3:00 pm)

Location

Taylors, Basseterre

Water security starts with you. Every drop saved helps protect our nation's water supply. Join the campaign and discover simple ways to conserve water, reduce waste, and help build a more resilient St. Kitts—because every action matters, and every drop counts.
Water Conservation Flyer

Current Campaigns

Street Scout

Related articles

PWD Continues Road and Drainage Works in Saint Thomas and Saint Peter

Basseterre, Saint Kitts (Public Infrastructure News) – On Tuesday, September 22, 2026, the Roads and Drains Division of the Public Works...

Take a Look at PWD’s Fieldwork for September 21, 2026

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 21, 2026, the Roads and Drains Division of the Public Works...

PWD Field Teams Carry Out Road and Drainage Improvements in St. Peters and Half Way Tree

Basseterre, Saint Kitts (Public Infrastructure News) – On Tuesday, September 15, 2026, the Roads and Drains Division (RDD) of...

PWD’s Fieldwork and In-House Operations Continue

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 14, 2026, the Roads and Drains Division (RDD) of...