Track the PWD’s Activities for Monday, May 19, 2025

Date:

Basseterre, St. Kitts (MoPIEUDT NEWS) – Each day, the hardworking team at the Public Works Department tackles the roadways, drainage, and shrubbery around the island, battling the scorching heat and rainfall, to ensure that road users and pedestrians have a comfortable experience as they move around the island.

On Monday, May 19, 2025, the team will continue its work on Southwell Drive, Newtown, and also clean the storm drain in Cayon, from debris that accumulated following recent heavy rainfall.

The PWD asks motorists traversing these areas to exercise caution to ensure personal safety and the safety of its workers, other drivers, and pedestrians.

For more information from the Public Works Department, visit mopieudt.gov.kn, and follow the PWD on Facebook.

Water security starts with you. Every drop saved helps protect our nation's water supply. Join the campaign and discover simple ways to conserve water, reduce waste, and help build a more resilient St. Kitts—because every action matters, and every drop counts.
Water Conservation Flyer

Current Campaigns

Street Scout

Related articles

PWD Continues Road and Drainage Works in Saint Thomas and Saint Peter

Basseterre, Saint Kitts (Public Infrastructure News) – On Tuesday, September 22, 2026, the Roads and Drains Division of the Public Works...

Take a Look at PWD’s Fieldwork for September 21, 2026

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 21, 2026, the Roads and Drains Division of the Public Works...

PWD Field Teams Carry Out Road and Drainage Improvements in St. Peters and Half Way Tree

Basseterre, Saint Kitts (Public Infrastructure News) – On Tuesday, September 15, 2026, the Roads and Drains Division (RDD) of...

PWD’s Fieldwork and In-House Operations Continue

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 14, 2026, the Roads and Drains Division (RDD) of...