PWD Road Tracker: June 23, 2025

Date:

Basseterre, St. Kitts (MoPIEUDT NEWS) – On Monday, June 23, 2025, the Roads Division of the Public Works Department (PWD) will carry out infrastructure maintenance in several communities on the island.

In Half Moon, one concrete crew will cast the driveway for the road that was impacted by recent flooding. Another concrete crew will be at Trinity constructing a retaining wall to stabilize the area that was washed out by flood. The asphalt crew will undertake patching in multiple areas including, the F.T. Williams Highway, New Road and Newtown in the vicinity of the Tucker Clarke Primary School.

Road users are advised to expect temporary traffic disruptions and possible detours while work is in progress. The PWD kindly asks all motorists and pedestrians to exercise caution and adhere to all posted signage.

The Public Works Department is grateful for your patience and cooperation as we work to maintain and improve the island’s infrastructure.

For more updates from PWD, visit mopieudt.gov.kn and stay tuned to our Facebook page.

Water security starts with you. Every drop saved helps protect our nation's water supply. Join the campaign and discover simple ways to conserve water, reduce waste, and help build a more resilient St. Kitts—because every action matters, and every drop counts.
Water Conservation Flyer

Current Campaigns

Street Scout

Related articles

PWD Continues Road and Drainage Works in Saint Thomas and Saint Peter

Basseterre, Saint Kitts (Public Infrastructure News) – On Tuesday, September 22, 2026, the Roads and Drains Division of the Public Works...

Take a Look at PWD’s Fieldwork for September 21, 2026

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 21, 2026, the Roads and Drains Division of the Public Works...

PWD Field Teams Carry Out Road and Drainage Improvements in St. Peters and Half Way Tree

Basseterre, Saint Kitts (Public Infrastructure News) – On Tuesday, September 15, 2026, the Roads and Drains Division (RDD) of...

PWD’s Fieldwork and In-House Operations Continue

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 14, 2026, the Roads and Drains Division (RDD) of...