Roads and Drains Division Activities for Monday, June 30, 2025

Date:

Basseterre, St. Kitts (MoPIEUDT NEWS) – Today will be another busy day for the team of the Roads and Drains Division of the Public Works Department on St. Kitts. Look out for them at the following locations:

  • Trinity – backfilling the retaining wall that was damaged during recent heavy rain.
  • Half Moon – preparing to cast a wing wall that was damaged by heavy rain.
  • The Southeast Peninsula – trimming overgrown hedges that extend to the road.

The Public Works Department urges drivers and pedestrians to exercise caution when travelling through these areas.

For more information from the Public Works Department, visit mopieudt.gov.kn and follow the department’s Facebook page.

Water security starts with you. Every drop saved helps protect our nation's water supply. Join the campaign and discover simple ways to conserve water, reduce waste, and help build a more resilient St. Kitts—because every action matters, and every drop counts.
Water Conservation Flyer

Current Campaigns

Street Scout

Related articles

PWD Continues Road and Drainage Works in Saint Thomas and Saint Peter

Basseterre, Saint Kitts (Public Infrastructure News) – On Tuesday, September 22, 2026, the Roads and Drains Division of the Public Works...

Take a Look at PWD’s Fieldwork for September 21, 2026

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 21, 2026, the Roads and Drains Division of the Public Works...

PWD Field Teams Carry Out Road and Drainage Improvements in St. Peters and Half Way Tree

Basseterre, Saint Kitts (Public Infrastructure News) – On Tuesday, September 15, 2026, the Roads and Drains Division (RDD) of...

PWD’s Fieldwork and In-House Operations Continue

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 14, 2026, the Roads and Drains Division (RDD) of...