PWD Roads and Drains Division Activity for July 2 – 3, 2025

Date:

Basseterre, St. Kitts (MoPIEUDT NEWS) – The Roads and Drains Division of the Public Works Department (PWD) will continue its work to maintain and upgrade the roadways around the island:

  • Following the milling of Bourkes Road, Sandy Point, on July 1, 2025, the team will prepare the road for paving.
  • Additionally, work continues on the retaining wall in Trinity and the wing wall in Half Moon.
  • The team will also continue to trim overgrown shrubs along the roadway at the Southeast Peninsula.

These activities will continue on Thursday, July 3.

The PWD asks pedestrians and drivers to be alert when travelling through these areas.

For more information, visit mopieudt.gov.kn and follow the PWD on Facebook.

Water security starts with you. Every drop saved helps protect our nation's water supply. Join the campaign and discover simple ways to conserve water, reduce waste, and help build a more resilient St. Kitts—because every action matters, and every drop counts.
Water Conservation Flyer

Current Campaigns

Street Scout

Related articles

PWD Continues Road and Drainage Works in Saint Thomas and Saint Peter

Basseterre, Saint Kitts (Public Infrastructure News) – On Tuesday, September 22, 2026, the Roads and Drains Division of the Public Works...

Take a Look at PWD’s Fieldwork for September 21, 2026

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 21, 2026, the Roads and Drains Division of the Public Works...

PWD Field Teams Carry Out Road and Drainage Improvements in St. Peters and Half Way Tree

Basseterre, Saint Kitts (Public Infrastructure News) – On Tuesday, September 15, 2026, the Roads and Drains Division (RDD) of...

PWD’s Fieldwork and In-House Operations Continue

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 14, 2026, the Roads and Drains Division (RDD) of...