See PWD’s Roadwork Schedule for May 6, 2026

Date:

Basseterre, Saint Kitts (Public Infrastructure News) – The Roads and Drains Division within the Public Works Department (PWD) will continue maintenance of the island’s infrastructure on Wednesday, May 6, 2026, in the following areas:

ProjectLocationStatus
RoadworkNew Road Blvd. & adjacent street(s)Ongoing
Construction of a retaining wallCayonOngoing
Preparation for new asphalt plantPWD GroundsOngoing

The PWD advises motorists and pedestrians to exercise caution when traveling in these areas and adhere to all road signage.

To report road issues, please visit the Customer Support Portal, or call PWD’s Roads and Drains Division at (869) 467-1132.

Follow the Public Works Department at mopieudt.gov.knthe PWD’s Facebook page, and the Ministry’s Social Media pages for updates.

Water security starts with you. Every drop saved helps protect our nation's water supply. Join the campaign and discover simple ways to conserve water, reduce waste, and help build a more resilient St. Kitts—because every action matters, and every drop counts.
Water Conservation Flyer

Current Campaigns

Street Scout

Related articles

PWD Continues Road and Drainage Works in Saint Thomas and Saint Peter

Basseterre, Saint Kitts (Public Infrastructure News) – On Tuesday, September 22, 2026, the Roads and Drains Division of the Public Works...

Take a Look at PWD’s Fieldwork for September 21, 2026

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 21, 2026, the Roads and Drains Division of the Public Works...

PWD Field Teams Carry Out Road and Drainage Improvements in St. Peters and Half Way Tree

Basseterre, Saint Kitts (Public Infrastructure News) – On Tuesday, September 15, 2026, the Roads and Drains Division (RDD) of...

PWD’s Fieldwork and In-House Operations Continue

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 14, 2026, the Roads and Drains Division (RDD) of...